• Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
  • Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
  • Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
  • Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
  • Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
  • Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track

Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track

After-sales Service: Installation Technical Assistance
Warranty: 2 Years
Game: Running
Thickness: 13mm to 16mm
Shock Absorption Rate: >53%
Friction Factor: 0.57
Samples:
US$ 5/Square Foot 1 Square Foot(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 11 foreign trading staff(s) and 2 staff(s) with over 6 years of overseas trading experience
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
to see all verified strength labels (14)

Basic Info.

Pattern
Sand
Color
Red, Blue, Green (16 Colors)
Installation Ways
Machine or Human Casting
Vertical Deformation
2.3mm
Usage
Outdoor, Indoor
Environmental Protection Level
E1
Durable Years
8-10 Years
Feature
Environmental Friendly
Material
Polyurethane
Function
Waterproof, Anti-Static
Raw Material
Edpm, SBR, PU Binder
Application
School, Stadium, Playground
Sample
Free
Certificate
Iaaf
Producing Speed
15 Days for 400m Standard Track
Temperature
-30 to 60 Centigrade Degree
Transport Package
PU Material 200kg/Drum, EPDM/SBR Granules:25kg/Bag
Specification
200kg/drum; 25kg/bag
Trademark
Flyon
Origin
China
Production Capacity
10000square Meter/Week

Product Description

Name  Full Pour System Running Track    
Base Requirement Cement Concrete or Bituminous Concrete 
Thickness 9-13mm
Suitable Scope EDPM (10 percent), less or none SBR,PU Binder
Sample shipping  Air freight
Offical order product shipping Sea Cargo Ship or Train
Producing Time  15 days 

Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running TrackInstallation Technical Assistance Iaaf Certificate Athletics Sports Floor Running TrackInstallation Technical Assistance Iaaf Certificate Athletics Sports Floor Running TrackInstallation Technical Assistance Iaaf Certificate Athletics Sports Floor Running TrackInstallation Technical Assistance Iaaf Certificate Athletics Sports Floor Running TrackInstallation Technical Assistance Iaaf Certificate Athletics Sports Floor Running TrackInstallation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track

Project  Pictures

Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track
Installation Technical Assistance Iaaf Certificate Athletics Sports Floor Running Track

 


Running Track Athletic Track 

 

The base layer consists of Black Styrene Butadiene Rubber(SBR) granules,bound together  with a specially formulated,  100% s olids  MDI  based  single  component polyurethane,at a thickness of 10mm(3/8inch).the top layer consists of a specially formulated, colored polyurethane into Ethylene Propylene Dience Monomer(EPDM) which  granules have been embedded before curing for a thickness of 3mm(1/8inch).

Name  Full Pour System Running Track    
Base Requirement Cement Concrete or Bituminous Concrete 
Thickness 9-13mm
Suitable Scope EDPM (10 percent), less or none SBR,PU Binder

 Packaging & Shipping

MOQ 500 Square Meter
Supply Ability 1000Tons/Per Month
Delivery Times 15days
Payment Terms T/T
Port Guangzhou 
FAQ
Q:What is the Production time?

 A:15-25days.

Q:What are the options for the base construction of a running track?

A:Based on asphalt or concrete.
 
Q:What is the life Span for Running track?

A:10-15years.

Q:How many system of Synthetic track surface,what is the best choice?

A: 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.

 
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich sytem: EPDM broad be handwork,is professional than spray coat,most pouplar in the world market.
Full pour System: Best quality, bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricate :Eco-friendly,package by roll, easy for installation,Professional for stadium international games.


 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company
Type of Ownership
Limited Company